Government equipment tends to leave in batches: a desktop refresh, a server room consolidation, an office move, or the surplus that builds up between them. A typical project includes:
- Desktops, laptops, tablets and phones
- Servers, storage arrays, backup tapes and network switches
- Communications equipment and electronics from airport and aviation programs, such as navigation and flight-information systems
- UPS systems and the batteries inside them
- Monitors, printers and copiers, including older CRT displays
- Fluorescent lamps and ballasts from facility work
Every data-bearing asset is identified before it is loaded. Drives are scanned by serial number, then wiped to NIST 800-88 if the equipment will be reused, or shredded if it will not. When agency policy calls for witnessed destruction, our mobile shredder works at your loading dock, and the certificate can list make, model, method and serial number for each drive.
Classified or otherwise restricted assets stay out of a standard pickup. Confirm clearance and facility-access requirements for the exact scope before you assign that work.
Loads are logged in our tracking database from pickup to final processing. You receive certificates of destruction and recycling that match your release paperwork, and shredded material is recycled through ISO 14001-certified downstream vendors. Our own operations are certified to ISO 9001, ISO 14001 and ISO 45001.
Agency projects draw on ITAD services, data center and UPS decommissioning, server disposal and battery recycling. Request a quote with your surplus list to get started.
Agencies retire desktops, laptops, servers, storage, communications equipment and the UPS batteries behind them, usually in batches after a refresh or a server room consolidation. Before anything leaves your control, we inventory the data-bearing assets by serial number and either wipe them to NIST 800-88 or shred them, on-site at your loading dock if policy calls for witnessed destruction. Each load is tracked to final processing and closes with certificates your property and records staff can file.
Simplify your compliance and disposal process with bundled recycling services that handle both electronic devices and batteries in one streamlined solution.
Our scheduled, route-based pickups cover all major regions of California—ensuring efficient, on-time service no matter where you operate.
We provide clearly labeled, tamper-resistant containers to ensure safe and compliant collection of electronic waste and batteries at your location.
Modern Waste Solutions has served businesses and communities across California with dependable, environmentally responsible recycling solutions for over two decades.
Reviews
A little bit off the beaten track in Natomas, but Modern Waste quickly and efficiently helped me recycle my broken Lithium Iron Phosphate batteries at a reasonable $/lb fee (Sac county e-waste will not accept these items). Ramiro and Vincent were very friendly and helpful.
Chris was awesome! He came in and picked up all of the e-waste we had ready for him. He was polite and professional throughout the entire process. He handled the equipment with care, including the site equipment that was already in place. I am very happy with his service and appreciate the great job he did.
Aaron and Vincent were awesome, excellent customer service!
Great guys, excellent customer service, highly recommend!
Polite, quick and easy.
Chris from modern waste was the most outstanding respectful person I ever met my life when he was done he offered to sweep the floors. He offered so much even though he was limited on time he went out of his way and he’s over beyond best guy I ever met thank you so much for your service services Dan ITG.
We have answers.
Your agency's policy sets the rules, and we build the job around it. Before pickup we confirm who can release the equipment, which assets carry data, whether each drive is to be wiped or shredded, whether destruction has to be witnessed, and what the certificate must list.
The work then follows written procedures under our ISO 9001 quality, ISO 14001 environmental and ISO 45001 safety management systems. Serial numbers are recorded, the load is tracked to final processing, and the closing records are matched to your inventory.
Commercial certifications are not security clearances. If a project involves classified equipment or requires cleared personnel, confirm those requirements before you assign the work, and keep restricted assets out of a standard pickup until an authorized process is agreed.
Most agency projects start with a surplus or refresh list and end with a certificate that goes into the property file. In between, the work follows our six steps:
- Equipment: we supply gaylord boxes, carts or pallets sized to the load, with labels for data-bearing items.
- Training: your staff learn which items go in which container and what must be held back, such as restricted assets or damaged batteries.
- Pick-up: our own drivers collect the approved equipment on the scheduled date.
- Tracking: assets are logged by serial number, or by weight and count where the agency does not need asset-level detail.
- Processing: drives are wiped to NIST 800-88 or shredded, and the remaining material is dismantled and recycled.
- Reports: you receive certificates of destruction and recycling that match the release paperwork.
Data-bearing assets are identified and counted before anything is loaded. Hard drives are pulled from desktops, laptops and servers, their serial numbers are scanned, and each drive is either wiped to NIST 800-88 for reuse or shredded. If agency policy calls for witnessed destruction, our mobile shredder can do the work at your loading dock.
Technician perspective: Settle access controls and release authority before the crew arrives. A clear sign-off keeps restricted equipment from leaving under a general recycling authorization.
The certificate of destruction can list make, model, method and serial number for each drive, so property officers can close out the inventory line by line.
Government IT asset disposition is the retirement of agency computers, servers, storage, phones and communications equipment in a way that protects the data on them and leaves an audit trail. It covers everything between an asset being declared surplus and its final reuse or recycling.
It differs from a surplus sale or a hauling job because every data-bearing device has to be sanitized or destroyed first, and each step needs a record. An agency should be able to show, asset by asset, what left the building, who handled it and what happened to it.
A government project can include any of the pieces below. The quote lists which ones apply to your equipment.
| Service element | Typical scope |
|---|---|
| Project planning | Scope, access restrictions, timeline, asset inventory, and approved disposition rules. |
| Equipment removal | Controlled removal of approved servers, storage, network, power, and electronic equipment. |
| Data handling | Specified wiping or physical destruction with chain-of-custody documentation. |
| Recycling | Responsible processing and downstream management for approved non-data materials. |
| Closeout | Reports and certificates matched to the agency's agreed documentation fields. |
Batteries from UPS units and portable devices, CRT monitors, and fluorescent lamps can be added to the same project, so a building cleanout does not need a separate vendor for each material.
Most of the problems surface during an audit or after a refresh cycle, when retired equipment piles up faster than anyone can document it.
- Laptops and servers sitting in storage rooms for months because no one owns the disposition step.
- Drives leaving with surplus equipment and no record that they were sanitized.
- Inventory lists that no longer match what was picked up, which leaves property records open.
- Batteries and CRT monitors ending up in general trash or scrap.
A written disposition process gives each of these a set path and produces the records that close them out.
Ask questions that show how the vendor handles your equipment after it leaves the building:
- Who transports the equipment? Ours is collected by our own drivers, never a subcontractor.
- Can destruction be witnessed on site, and can the certificate list each drive by serial number?
- Which methods are available? We wipe to NIST 800-88 when equipment will be reused and shred it when it will not.
- Where does the non-data material go? Our shredded material is recycled through ISO 14001-certified downstream vendors.
- Are the vendor's certifications current? Ask to see our ISO 9001, 14001 and 45001 certificates.
Check escort, work-window and facility-access rules against the vendor's crew plan as well, before the first pickup is booked.
In a government building, data center work usually depends more on access rules and timing than on the equipment itself. Settle these points before you request a date:
- Document site-access rules, escorts, work windows, and approved personnel requirements.
- Separate classified or otherwise restricted assets from standard commercial e-waste unless a specifically authorized process is confirmed.
- Define inventory, serial-number, witnessing, destruction, and certificate requirements in writing.
- Confirm project phasing and contingency plans before disconnecting live infrastructure.
Include rack counts, photos, UPS details and your deadline in the quote request. For the equipment side, see our data center and UPS decommissioning service.
- City, county and state IT departments consolidating server rooms or moving systems to cloud hosting.
- Federal offices and military units retiring servers, storage and communications equipment.
- Airport and aviation programs replacing flight-information displays, navigation and communications electronics.
- Contractors who manage government equipment at several sites and need one set of records.
Size does not decide it. One closet server that held case records needs the same documented handling as a full room of racks.





